The Brockville Record

Railway Tunnel Committee (BRTC)

June 8, 2017

What was decided (4 motions)

4 carried, 0 recorded otherwise. Every motion below is printed as the minutes print it.

THAT the Agenda for the June 8, 2017 meeting of the Brockville Railway Tunnel Committee be approved.
Moved by Linda, seconded by Keith
Carried
THAT the minutes of the Brockville Railway Tunnel Committee meeting dated May 11, 2017 be adopted as circulated.
Moved by Brian, seconded by George
Carried
THAT the drawings from Eastern Engineering for the south end of the tunnel be accepted with the exception that the large concrete plaza ends at the same place as the concrete stamping ends, at a cost of $200,000.
Moved by Linda, seconded by Jim
Carried
THAT the quote from Mark Jones for $700 be accepted to remove all the trees and brush in the proposed parking area.
Moved by Jim, seconded by Keith
Carried

The town’s own record

Read the minutes this page was read from →

Where this page and that document disagree, the document is right and this record is wrong. Say so and it will be corrected.